WorkChai
Documentation / Public user guide / November 2026

WorkChai user guide

Learn how to organize tasks, focus on priorities, manage projects and goals, track habits and workouts, organize private notes, and understand every XP reward.

Open WorkChai ↗

1. Getting started

WorkChai combines task planning, project and goal progress, daily habits, workout logging and an XP ledger in one workspace. Use workchai.com to sign in or register when registration is enabled. If email verification is required, complete it before using restricted features.

  1. Open Profile and set your preferred timezone, display name and weight unit.
  2. Open Tasks, create a board and add a few real tasks. A goal or project is optional.
  3. Set realistic priorities, deadlines and XP rewards. Use the dashboard to choose what to work on next.
  4. Use Habits for recurring actions and Fit for workouts. Review XP and history on Profile.
About this guide: Documents the supplied November 25, 2026 web application source and subsequent Blog and Priority Workspace upgrades. The administrator controls some global defaults; your actual limits may differ. The guide is not a promise that every optional upgrade has been installed on your account.

2. Dashboard and navigation

Dashboard / Overview brings together total XP, level progress (if enabled), next tasks, current goals and projects, and budget health warnings. The priority upgrade adds urgent, high and deadline counts, an Open Priority Tasks shortcut, the total open-task count, a Tasks shortcut and the five most-used open boards.

Priority counts cover unfinished tasks on your own boards; an urgent task with a deadline contributes to both counts. Most-used boards are ranked by your recorded task actions in the last 30 days (excluding reorder actions); boards with no activity may appear after active ones. Select a board to open it directly.

Use the desktop Top menu / Sidebar controls to choose your navigation layout. The display settings include timezone, XP-only versus XP plus levels, task card color-edge thickness and navigation density. On mobile, use the bottom menu and the Blog menu in the header. Theme controls switch between light and dark mode.

The Dashboard uses a compact, full-width workspace without the greeting banner or Start training shortcut. Open Fit directly from navigation to train.

3. Boards and tasks

Create your first board

  1. Open Tasks and select New Board.
  2. Enter a name, choose the column layout and optionally link the board to a project.
  3. Select the board. The app remembers the last selected board, including accepted shared boards, where available.
  4. Use the plus control on a column or Quick Task to add work. A new task cannot be created as already completed simply by using the Done column.
Draft→To Do→In Progress→Done

Draft is for ideas; To Do is ready work; In Progress is active work; Done is actual completion. A three-column layout is also available. Rename columns using their edit controls. Reorder cards within a column by dragging on desktop. Moving between columns may change task state; moving into a completion column records completion and may award XP. Reopening a completed task returns it to a non-completed workflow state (normally To Do).

Task editor

Click a card to edit its title, rich description (visual or HTML source), color, priority, XP reward, board, project, project milestone, goal, goal milestone, estimated finish and estimated minutes. If the title is blank, the app can derive it from the description. Save to commit edits; merely opening or typing does not save.

Use the Board field to move a task to another eligible open board. Project milestone selection depends on the selected project. Goal milestone selection depends on the selected goal. Linked boards can supply the effective project for budget and progress. Choose associations carefully because moving a task can change its XP budget availability.

Bulk work and archive

The Tasks interface supports bulk task entry and Excel/CSV import where available. Review imported titles and XP before saving. Use archive controls to remove finished or abandoned work from active views without pretending it was completed. Use archive filters and restore controls to recover work. Closed or archived boards and projects may be read-only until reopened. Permanent board removal is owner-only and retains historical progression records.

Task titles and rich descriptions support emojis and country flags, including on desktop browsers. WorkChai serves the flag font locally.

4. Priority Tasks — the Fire view

Click the Fire icon next to Timeline in Tasks, or open Priority Tasks from the dashboard. The unified Kanban shows qualifying non-archived tasks across your own eligible boards, without a board selector.

Task typeIncluded?
UrgentYes — first priority group
HighYes — second priority group
Normal / Low with estimated finishYes — third group
Normal / Low without estimated finishNo
Tasks on boards owned by someone elseNo — use the shared board itself

Within each group, dates sort earliest first, followed by existing position and ID. A task with both urgent priority and a deadline appears only once. Completed qualifying cards may appear in Done, but dashboard counts are for unfinished work. Use the existing task actions and original board column mapping. Drag to set a custom order in this view; it is saved locally per user, separate from original board ordering, and can be reset. It does not synchronize across devices. Load more if there are further pages (100 results per request).

5. Timers and Activity Timeline

Press Play on an eligible task to start a work session. Press Stop to record the session end. The default is up to three simultaneous timers per user; the administrator can change it. Starting a fourth at the default limit is rejected, not used to stop another timer automatically. On mobile, starting work moves the active view to the In Progress column when appropriate; completing work does not force a switch to Done.

Click the Timeline button for a Gantt-like view of actual sessions for unfinished tasks on the selected board. Switch Day / Week, navigate dates and scroll horizontally. The task list stays visible alongside session bars; use Play/Stop directly from the timeline. Returning to the normal Kanban does not erase tracked time.

How total working time is calculated

Projects, goals and milestones combine the actual time intervals of associated tasks, including retained archived sessions and running sessions where applicable. Overlapping time is counted once: if Task A runs 10:00–11:00 and Task B runs 10:30–11:30, the combined elapsed time is 90 minutes, not 120. Old counters without timestamps are retained as estimated time. Time attribution follows current relationships, not historical task assignment. Task activity also records actions and timestamps.

6. Projects and milestones

A project groups work, boards and milestones. A goal is optional. Open Projects, create a project, enter a name and optionally description, priority, XP budget, money budget (USD), completion mode, goal and goal milestone. A money budget is planning metadata, not XP or a payment balance.

  1. Create or link one or more boards. Tasks on a linked board can count toward that project even without an explicit task project link.
  2. Create project milestones as ordered stages. Give each a title, budget and completion mode.
  3. Choose the project, then its milestone, in each relevant task editor.
  4. Open the project’s Tasks view to work with its boards. Direct project tasks on unrelated boards are listed separately.

Project cards include board/task counts and working time. Upload, replace or remove an optional project thumbnail. Project milestones are separate from goal milestones. Automatic project completion considers its relevant tasks and project milestones; manual completion can finish and archive active tasks and boards under the configured rules. A manual project milestone is not automatically marked complete merely because the project is manually completed.

7. Goals and completion requirements

Open Goals and create a goal with title, description, target date, priority, XP budget and completion mode. Add a thumbnail if desired. Add goal milestones when meaningful, or attach tasks directly. Select the required projects and tasks in the available requirements editors; some selectors load a limited initial list of tasks.

Goal→Goal milestone or project→Project milestone→Task

Not every level is required. A goal can depend on multiple projects or milestones. A project can belong to a goal milestone. Explicit completion requirements can add relationships without making every relationship an XP budget parent.

Automatic entityRequired work
Project milestoneIts required active or previously completed tasks.
ProjectRelevant project tasks (including linked boards) and project milestones.
Goal milestoneLinked and explicitly required tasks/projects.
GoalGoal milestones, directly or explicitly linked tasks, and linked/required projects (including their outstanding project milestones).

Automatic completion requires nonempty applicable work and a genuine completion event. All required conditions must be satisfied. Manual completion can be more permissive depending on administrator policies; manually completing a milestone does not necessarily satisfy its unfinished underlying tasks or projects for a higher goal.

Archive is not completion: If A is completed and B is archived unfinished, their automatic milestone does not suddenly finish. Add a new required task C and actually complete C to trigger a new completion evaluation.

8. XP fundamentals and budget modes

XP is a record of earned progress, not money. A task reward is a promised allocation; it becomes earned XP only when the task is completed. A parent budget is either a shared pool or an individual reward depending on the administrator’s economy mode. A board does not have a separate XP budget merely because it groups tasks.

ModeWhat shares a poolExample
Goal-controlled (default)Goal → goal milestone/project → project milestone → tasks, where structurally linked. Projects without a goal still cap their own descendants.1,000 XP goal with a 600 XP project: the 600 is part of 1,000.
Project-controlledProject and its project milestones/tasks share one pool. Goals and goal milestones have their own rewards; a task linked only to a goal does not consume that goal’s pool.600 XP project + 1,000 XP goal can award separately.
IndependentNo parent-child monetary pool; each entity has its own configured reward or budget. Task ceilings and completion dependencies still apply.100 XP task + 600 XP project + 1,000 XP goal can award 1,700 XP if all qualifying events occur.

Budget ownership versus completion links

A task has one economic parent in the shared modes, not one charge for every completion link. The structural project milestone/project takes precedence over direct goal milestone/goal in Goal-controlled mode. If no explicit task project is set, a linked board can supply the project. Project-controlled mode uses only project-side economic parents. Older project requirement links may infer one unambiguous goal parent. Extra completion requirements do not automatically allocate a second budget.

Use the available reward displayed in the task editor; the server checks every applicable budget and task limit on save. Default rewards may be clipped to available space; explicit amounts above the limit are rejected. Zero XP is allowed. A completed reward must be reopened before changing it. The shipped defaults are 10 XP for a new task, maximum 100 XP for standalone tasks, and global maximum 10,000 XP per task; actual settings may differ.

Example A — A goal with a 1,000 XP budget

Assume Goal-controlled mode, no prior awards and the remaining-budget reward enabled. Allocate 600 XP to a project, 200 XP to a goal milestone and 100 XP to direct goal tasks. The remaining 100 XP is not yet earned.

AllocationXP
Project budget (inclusive of its own tasks)600
Goal milestone budget200
Direct tasks100
Unallocated goal budget100

If the project contains 450 XP of task rewards, its completion may award 150 XP; its full 600 XP charge is already included in the goal. If the goal milestone contains 150 XP of tasks, its completion may award 50 XP. When all required work is completed, the goal may award the remaining 100 XP. Total across the tree: 1,000 XP, not 1,000 plus all the child rewards.

Example B — A 200 XP project

Ten tasks worth 20 XP each are valid. Ten tasks worth 30 XP each require 300 XP and exceed the budget by 100 XP. A single 200 XP task consumes the whole project allocation. With four 25 XP tasks, 100 XP remains for other allocations or a possible completion bonus.

Example C — Archive and reopen

In a 200 XP project, two tasks reserve 80 XP each. Completing the first earns 80 XP. Archiving the second while unfinished releases its 80 XP allocation; it awards nothing. The first task still consumes 80 XP. The project now has 120 XP of unallocated budget, but archiving does not itself trigger automatic completion. Reopening the completed first task reverses its 80 XP award and reserves its configured 80 XP again. An automatically completed ancestor may also reverse its recorded bonus if that policy is enabled.

Try a simple shared-budget calculation

For a single parent, enter its total budget, its existing own award and the sum of its active child allocations or retained awards. This is an educational calculation, not a live account or permission check.

Remaining: 350 XP · Deficit: 0 XP
Remaining is a possible parent completion bonus only when completion rules and the configured reward policy permit it. A nested tree must be evaluated at every level.

9. Earned XP, reversals and deficits

Profile shows your earned total, level progression (if enabled) and XP ledger. Ledger entries explain awards and reversals. Each completed task records its awarded amount and original recipient. Reopening subtracts the original award, rather than creating another reward. Completing it again can award its configured reward once; repeated requests are designed not to mint duplicate XP.

ActionXP effect
Create / edit unfinished taskReserve reward within budget; no earned XP yet.
Complete taskCredit configured reward to the eligible recipient.
Archive unfinished taskRelease its reservation; no completion award.
Archive completed taskPreserve its earned XP.
Reopen completed taskReverse its recorded award; reserve reward again if active.
Complete goal / milestone / projectPossible remaining-budget reward in shared modes, or own reward in Independent mode.
Archive project / boardNo new completion award; release qualifying unfinished allocations.

If the dashboard says “XP budget deficit”

A deficit means allocations and retained awards exceed a budget under the current mode. It is not a negative XP balance or a fine. For example, 1,350 XP allocated against a 1,000 XP pool means a 350 XP deficit. Changing economy mode can reveal existing conflicts without deleting historical XP. Existing deficits may remain; new changes must not worsen them.

  1. Open the affected goal, milestone or project and inspect its budget and associations.
  2. Lower an unfinished task reward, release an unnecessary unfinished allocation, correct the economic parent, or increase a valid parent budget if allowed by higher limits.
  3. Reopen completed work only when it genuinely needs to be reopened; its earned XP will reverse.
  4. Check the dashboard again. Nested conflicts can refer to the same underlying allocation; do not add them as unique debt.

Restoring archived unfinished work may require enough budget again. If a restore is rejected for a true deficit, free capacity first. Reopening an automatic parent may reverse its bonus under the current policy.

10. Sharing and permissions

Boards are private by default unless the administrator changes that default. Open Board Settings, select Closed Sharing, invite another user by username, and choose Manager or Guest. The recipient accepts the invitation before gaining access. Use membership controls to revoke access or change sharing. Other private boards, projects and goals remain protected.

ActionOwnerManagerGuest
Read accepted boardYesYesYes
Create taskYesYesIf allowed; zero XP
Edit / reorder / complete / archive tasksYesYesNo
Manage board / invitationsYesYesNo
Permanently remove boardYesNoNo
Remove ownerNoNoNo

Assign a shared task to the owner or an accepted member before completion. A guest-created task starts with zero XP; an authorized manager or owner may allocate a reward. The board owner’s structural budget is charged, even if a different member receives XP. By default the assignee receives it; the administrator may instead choose the owner or eligible completing actor. Reopening reverses the exact original recipient’s award even after the policy changes. Revoking membership or returning a board to private stops affected member timers and retains recorded time. You cannot stop another member’s timer as if it were yours.

11. Habits

Open Habits to track recurring check-off or quantity-based activities. Create a habit, choose a category and color, set type, daily target, unit and XP settings. Create or edit categories to organize your habits.

The current date appears on the left, followed by six previous dates. The view follows your preferred timezone and updates when the day changes. Navigate to prior periods to review or correct entries. Future dates are not valid daily entries. Check habits with one tap; for quantity habits, enter the actual amount and commit it. Streaks reflect consecutive days meeting the completion target.

Habit XP examples

Check habit: 5 XP for a checked day, 0 if unchecked. Quantity habit: 1 XP per 10 units; 25 units earns 2 XP (whole XP rounded down), even if the target is a different number. Changing 25 to 40 units credits only the difference, 2 more XP; clearing the entry reverses its earned XP. Existing positive daily entries retain their original reward settings rather than silently repricing when you edit the habit. Habit XP is separate from task budget pools.

Archive habits you no longer track; historical entries are retained. Use realistic reward ratios rather than artificially inflating quantities.

Suggestions, Categories and New habit appear together above the habit panel. Mobile defaults to Compact; desktop and mobile density preferences are remembered separately. Change the view whenever you need more space.

12. Fit — workouts and exercise history

Open Fit to record a workout. Search by exercise name or filter by activity type and muscle group. The catalog includes thumbnails and instructions. An exercise can target multiple groups (for example, Deadlift targets Back and Legs).

Weight training and timed activities

  1. Start or resume a workout session using the session controls at the top of the workspace.
  2. Choose a weight-training exercise, enter repetitions and weight in your preferred unit (kg or lb), then log each set.
  3. For Running or Treadmill, start the separate activity timer inside the workout. Stop it when finished and optionally enter distance. Stop an active timed activity before starting another.
  4. Review the current workout, edit or remove incorrect sets where allowed, and finish the workout when done.
  5. Use the add-exercise control if your exercise is missing. Choose its activity type and muscle groups. Your custom exercise is private to your account.

History and movement

Open Exercise history below Workout activity, or visit Fit history. Review daily, calendar and yearly activity. Sessions are separated and numbered chronologically within each day (Workout 1, Workout 2), rather than displaying internal IDs. Set records show exercise names, repetitions, weights and timestamps; timed activities show duration and recorded distance.

Daily movement displays available steps and distance in kilometers and miles. Automatic Android Health Connect and Apple Health synchronization and manual historical health imports are not yet implemented; the database is prepared for future integration.

Workout XP

By default a finished session with at least three logged sets receives 40 XP once; server configuration can change these values. A workout with too few sets does not qualify. Timed cardio does not automatically count as weight-training sets or earn a separate reward. Workout XP is separate from task budget pools, and repeating a finish request does not award it again. Log real sessions, not artificial duplicates.

13. Profile, appearance and account

Open Profile. Your welcome card displays your name, username and avatar. Select Edit profile to update display name, optional age, height, weight, preferred weight unit, timezone and XP level display. Preview or remove your profile photo using the available controls. Save changes before leaving. The timezone controls local calendar/date presentation; tracked sessions are stored in UTC.

Profile shows your progress and ledger. Hiding levels does not remove earned XP. Sign out from the username menu or Profile. Logging out in another tab also invalidates the local workspace session. If a session expires, sign in again; temporary service failures should be retried rather than treated as a reason to recreate tasks.

14. Blog and Notes

The WorkChai Blog is public. Guests can read published articles; signed-in users keep their workspace navigation. Articles may offer translated versions, thumbnails and categories. The Blog is informational, not a personal note editor.

Quick notes — capture an idea immediately

  1. Open Notes. The title field receives focus after the notebook selection loads.
  2. Type a title and press Enter on desktop or mobile, or select Save note. The contents are optional: when empty, the title becomes the note body.
  3. For longer notes, add contents using the compact Visual or HTML Source editor. The input expands as you type. Enter in the contents inserts a line break rather than submitting the note.

Desktop and mobile workspace

Desktop has three panels: notebooks and organization on the left, quick capture and the list of note titles in the middle, and the selected note editor on the right. Mobile puts quick capture above the list; use Notebooks & tags to show organization and open a note to edit it. Notes are ordered newest first by creation date, not last edit date.

The Notes heading includes the total matching count, for example Notes (1,212). It follows the selected notebook, category, tag and title search, including notes on later pages.

Editing and organizing

Select a note, edit its title and contents, then Save. Ctrl+S (Cmd+S on Mac) also saves. Switch between Visual rich text and HTML Source without creating a separate note. Use formatting and links in the visual editor; emojis and country flags are supported in titles and contents using the locally served flag font.

  • Notebooks: optional containers; a note can belong to one notebook or none. All notes includes both. Quick notes are created in the selected notebook.
  • Categories and tags: a note can have several of each. Type to see matching suggestions, select an existing item or create a new one on the fly. Use the removal control to unassign an item. Save the note to persist assignments.
  • Use title search or select notebook, category and tag filters to find notes. Quick notes also inherit selected category and tag filters.
  • Rename or remove organization items using their controls. Removing a notebook, category or tag does not delete its notes. Deleting a note itself removes it from the active list.

Remembered notebook

WorkChai remembers the last notebook (including All notes) locally for your account and synchronizes it with the server. Returning to Notes restores that selection; a new browser uses the saved server preference. A deleted or unavailable notebook falls back to All notes. If synchronization fails at logout, retry or explicitly sign out anyway.

Privacy: Notes and their organization are private to your account through the authenticated API. Notes do not earn XP. End-to-end note encryption and a historical note import interface are not currently available.

15. Common questions

Why can’t I allocate more XP to a task?

Check the global task ceiling, the standalone limit if relevant, and remaining capacity in every applicable parent budget. A completed task must be reopened before changing its reward.

Why didn’t my goal finish after archiving the final task?

Archive releases unfinished work without a completion event. It does not award XP or trigger automatic completion. Check remaining requirements and completion mode.

Why did my XP decrease?

Look at the ledger for reopened tasks or automatic parents and corrected habit entries. The original award is reversed rather than allowing repeated completion to inflate progress.

Why does my deadline total overlap urgent tasks?

Dashboard counts are separate categories. The Priority Tasks Kanban shows each qualifying task once.

Why can’t I start a timer?

Check your current timer count, board role, task state and whether another user owns the running session.

Why does a project show less elapsed time than its individual tasks combined?

Concurrent work intervals are merged so the same minute is not counted more than once.

Why can’t I see a board or uploaded image?

Confirm the invitation is accepted, the board is not archived, and the image has been saved. Refresh after a content update; if the issue persists, report the exact page and error to the administrator.

Why did Notes open a different notebook on another device?

A previously used browser prioritizes its local saved selection. A new browser uses the backend preference. If the remembered notebook is unavailable, All notes is selected.

Can I synchronize my smartwatch steps automatically?

Not yet. Health import storage is prepared, but provider permissions and synchronization require future implementation.